Dubai Weather Report Home Sitemap Contact Us
Entertainment Shopping Events Business Attractions
Home
About Dubai
Dubai Shopping Festival
Traveler Health Tips
Dubai Government Departments
DUBAICITY Wallpapers
Dubai Property
Dubai Golf
News
 
  Last cladding panel of Burj Dubai ready for installation
  07.28.2009
 
 
  Dubai, UAE; July 28, 2009: Panel number 24348, the last piece of glass cladding that will complete the exterior of Emaar Properties Burj Dubai, the world's tallest building, is now ready and awaiting installation.

Arabian Aluminium Company - a member of Al Ghurair Construction Industries LLC, started work on the exterior cladding of Burj Dubai in April 2007 and is now entering the final phase of cladding with the manufacture of the six-metre long last panel for the tower. The panel will be transported to the Burj Dubai work site for installation in the coming weeks.

The main materials used in the cladding are reflective glazing, aluminium mullions and textured steel spandrels with vertical stainless steel tubular fins. The cladding accentuates Burj Dubai's height while lending it a shimmering slenderness. Panels of more than 18 different strength specifications and over 200 sizes are being used for Burj Dubai, all of them double-glazed and factory-sealed.

This is the first time that Arabian Aluminium Company has worked on a project of this scale and took great care to ensure that each manufactured panel that left their factory met the highest standards and strictest specifications.

Currently standing at over 800 metres and scheduled to open this year, Burj Dubai is at the centre of Downtown Burj Dubai, a 500-acre mega project described as the new heart of the city of Dubai.
  Source:www.zawya.com news
  E-Mail this news to a friend Email this article  |   Print this pagePrinter Friendly Version        
Dubai NightLife
DubaiGetaway
© Dubai city 2009. All rights reserved.